Selected Projects ..............................
| Luogo |
Lobitos Field, Offshore Talara, Peru |
| Cliente Cescor |
PetroTech Peruana |
| Descrizione del progetto |
Lobitos Field, offshore Talara consists of several platform launched in sixties and seventies in a water depth ranging from 30 m up to 150 m.
In many platforms the original CP system was terminated and retrofitting was needed. After several evaluations and cost comparisons, impressed current was preferred.
Four platforms, PN-1, TT, LL and OO were retrofitted using tensioned anode strings and MMO-Ti (LIDA) anodes.
The following activities were carried out by Cescor:
preliminary site survey;
detail design of the CP systems;
material procurement;
supervision during installation;
testing and start-up. |
| Tempistica Progetto |
Started: Jan. 2002; completed: beginning 2003. Includes: 15 days survey; 2 months design; 1 year full project |
| Luogo |
Gela, Italy |
| Cliente Cescor |
Raffineria di Gela |
| Descrizione del progetto |
Design of the retrofitting of the impressed current CP systems for sealines from marine pier to damp and to PLEM.
Supply of materials; installation; commissioning and start-up. |
| Tempistica Progetto |
2005 |
| Luogo |
Dubai |
| Cliente Cescor |
Fisia Italimpianti |
| Descrizione del progetto |
Jebel Ali Power and Desalination Station "l" Phase II is owned by Dubai Electricity & Water Authority.
Design of the cathodic protection system for the water boxes with titanium tubes and copper nickel tubesheet and boxes.
Supply of materials, including pure iron galvanic anodes, reference electrodes, instrumentation. |
| Tempistica Progetto |
2005. In progress |

| Luogo |
North-Eastern Caspian Sea (Atyrau) - Kazakhstan |
| Cliente Cescor |
Saipem SPA |
| Descrizione del progetto |
Agip KCO is developing the Kashagan East Field, located in the North Caspian Sea offshore Kazakhstan, approximately 80 Km south of the town of Atyrau. The development comprises a combination of both offshore and onshore facilities.
The offshore production facilities will be tied back to onshore processing and storage facilities by the following pipelines:
Oil trunkline 28";
Gas trunkline 28"
Fuel gas trunkline 18".
The total length of the pipelines is about 110 Km. The scope of the Project was the design of the CP system of the pipelines. The onshore section, protected with a temporary Mg anodes CP system and then with a permanent ICCP system, will be separated with an insulating joint from the offshore section, protected with bracelet anodes.
The choice of the position of the insulating joint was the result of the study of the impact of the environmental variables (such as the water level variation) on the CP system. |
| Tempistica Progetto |
November 2004 - December 2005 |
| Luogo |
NC-41 Block, Mediterranean Sea Offshore Bengasi, Libya |
| Cliente Cescor |
Consorzio Saipem Energy Int. - Tecnomare |
| Descrizione del progetto |
Sabratha owned by ENI GAS is a 190 m depth platform to be located offshore Libya. Detail design included:
cathodic protection system for jacket structure, internal surfaces of caissons, internal surfaces of legs used for fuel storage.
cathodic protection monitoring system;
painting specification.
Cescor has advised the Consortium in material procurement activities and follow-up.
|
| Tempistica Progetto |
Started: mid 2002; completed March 2003. |
| Luogo |
Iran |
| Cliente Cescor |
Hyundai Engineering & Construction co. |
| Descrizione del progetto |
South Pars (onshore) Development Phase 4 & 5 owned by ENI Iran consists of a storage tank area, of Plant Facilities and interconnecting pipelines.
CP was required for tank bottoms (internal and external), U/G piping, drums, pipelines.
The Cescor scope of supply includes:
detail design of the CP systems for all mentioned items;
material procurement;
supervision during installation;
testing and start-up. |
| Tempistica Progetto |
Started: mid 2002; completed 2004. |
| Luogo |
Lobitos Field, Offshore Talara, Peru |
| Cliente Cescor |
PetroTech Peruana |
| Descrizione del progetto |
Continuation of a plan for the retrofitting of the CP systems of several platforms.
Two deep platforms, PN-2 and LO3 were retrofitted using MMO titanium anodes remotely installed on sleds.
Cescor was in charge for all the project activities on turn key basis. |
| Tempistica Progetto |
2005 |
| Luogo |
Attahaddy Gas Dev. Field, Libya |
| Cliente Cescor |
Hyundai Engineering & Construction co. |
| Descrizione del progetto |
Attahaddy Gas Field owned by Sirte Oil Company comprehends 28 gas wells, 3,000 m deep, 6 water wells and related flowlines, in-plant U/G piping and storage tanks.
CP was required for well casing, flowlines, tank bottoms (internal and external), U/G piping.
The following activities were carried out by Cescor:
site survey;
site survey for E-logI test on well casing, to establish the minimum protection current for CP design;
design of the CP systems for all mentioned items;
material procurement;
supervision during installation;
testing and start-up.
No. 18 ICCP systems. Total current capacity = 1,400 A.
|
| Tempistica Progetto |
Started: mid 2000; completed: beginning 2003. Includes: 2 months survey; 6 months design; 1.5 years full project |
| Luogo |
Priolo, Italy |
| Cliente Cescor |
ESSO AUGUSTA |
| Descrizione del progetto |
Esso Augusta Priolo refinery is one of the largest petrochemical complex in the Mediterranean sea.
The plant area is connected to shore by a number of buried pipelines conveying crude oil and refined products.
Replacement of the original CP systems was required after more than 20 years since installation. Impressed current systems were adopted using a combination of shallow horizontal and deep vertical groundbeds.
Cescor activities consisted in:
site survey;
detail design;
material procurement;
installation;
commissioning and start-up. |
| Tempistica Progetto |
2002- 2003 |
| Luogo |
Verona, Italy |
| Cliente Cescor |
Autostrada Brescia Verona Padova Venezia |
| Descrizione del progetto |
Cathodic protection was designed for corrosion prevention of piles and beams of the reinforced concrete highway viaduct crossing the Adige River, Verona, Italy.
CP was achieved by impressed current systems, using mixed metal oxide activated titanium mesh anodes. The project included:
detail design of the system;
supply of all materials for N. 7 independent CP systems, completed with automatic monitoring and control units;
supervision to installation and commissioning;
maintenance and control service. |
| Tempistica Progetto |
2001- 2002; periodical control since 2002. |
|